Technical consulting Can FM consulting professionals
participate from the project planning
and design phase?

Technical consulting is a value-providing service that improves the value of real estate.
From the project planning and design phase, FM expertise will be used to enhance the efficiency,
convenience and economy of facility operation.

FM Master participates
from the design stage
Operation and Management (O&M)
83.2%
Construction
16%
Planning and design
0.4%
Demolition and scrapping
0.4%
FM Master participates from the design stage
  • Review balance between excessive investment and insufficient investment
  • Review convenience, safety and usability from viewpoint of users
  • Identify and improve design problems in consideration of management aspects
  • Find defects in the construction process and review system suitability
FM Consulting Expected Effect by Participating in FM Master from the Design Stage
Expected benefits of FM consulting
Expected benefits of FM consulting
Designer
Securing comfort,
convenience and safety
through early stabilization
User
Securing comfort,
convenience and safety
through early stabilization

Improving value & quality
/ Reducing costs and risks

Client
Reducing energy and
management costs through
optimization consulting
Constructor
Reducing additional
construction costs by
minimizing building defects
and errors in management
and operation

FM consulting service for new buildings

S-1 reduces costs through phase-by-phase consulting and implements an optimal management and operating system.

Establishing
management and
operation strategies

PM/FM supervision

Design
improvement
consulting

Project
Management

  • STEP 1

    Design phase

    · Design support from the viewpoint of
    maintenance
    · Development of a system optimization and
    BOH operation concept
  • STEP 2

    Construction phase

    ·Construction support from the viewpoint of
    FM and technical consulting on issues
    ·Identification risks and proposal of cost
    reduction plans from the viewpoint of
    operation
  • STEP 3

    Completion phase

    ·Proposal of an FM strategy roadmap, facility
    management and operating model
    ·Early stabilization of building management
    and handover

FM consulting service for old buildings

Risks are identified through checking and analysis of the deterioration and operating status of buildings, and
improvement plans presented to improve efficiency.

Physical Due
Diligence (DDR)

Facility
management
efficiency analysis

Facility safety
analysis

Remodeling
analysis

  • STEP 1

    Understanding the
    characteristics of the
    building

    Use of the building and
    equipment history is
    reviewed
  • STEP 2

    Status investigation

    Status of deterioration and
    compliance with safety
    regulations is reviewed
  • STEP 3

    Status analysis

    Facility risks are identified
    and analyzed by area
  • STEP 4

    Deriving alternatives

    Physical status analysis and
    improvement ideas derived
  • STEP 5

    Reporting results

    Improvement plans
    presented and maintenance
    costs assessed